Streetly Community Centre

Brief

To provide and vibrant feel to compliment additional refurbishment being undertaken throughout the centre. To include suitable drainage and extraction. The completion of the project was long awaited and much anticipated by staff and the local community to completely remove existing facilities that had been installed for over 40 years and re plan space to allow for larger toilet areas and remove existing open plan shower facilities and replace with individual shower cubicles. Install drainage for shower cubicles and plaster walls.

Products

  • Compact laminate Shower and Toilet Cubicles
  • Compact laminate IPS access panels for back to wall toilets
  • Compact laminate vanities with semi recessed wash basins
  • Non concussive basin taps
  • Toilets – with hidden cisterns
  • Urinals – wall mounted
  • Thermostatic showers and valves
  • Flooring – Cap and coved safety flooring to washroom and changing areas
  • Tiling Floor and Wall – Non slip to shower areas
  • Lighting – LED panel grid lights
  • Suspended ceilings
  • Electric hand dryers
  • Extraction system
  • Mirrors – inset custom made
  • Clothes hangers
  • Toilet roll dispensers
  • Convector Radiators
  • UPVC windows

Installations

  • Complete removal and dispose of existing washrooms and provide suitable drainage to shower floor
  • Renovation of existing benches and installation of UPVC windows
  • Installers
  • Plumber
  • Electricians
  • Plastering
  • Ceiling fitter
  • Tilers
  • Floor layer
  • Decorating